Email
Call

Value creation

Since February, RH Pumper has been in dialog and close collaboration with a project group with 4 engineering students from Zealand in Næstved.

With a desire to create growth, RH Pumper and the students have conducted sparring, creative workshops, tested hypotheses and reviewed data. Only to be faced with an exciting innovation today.

The project team’s approach differentiates itself with new and exciting ways of working, taking our strengths, combined with what we are passionate about, and creating new directions and goals out of it.

The project work culminated in a written report where one of the selected ideas was worked through with a focus on implementation and finances.

The project team defended this report with top-notch character, but most importantly, we all left with a sense of learning and value creation.

Contact us

Cases

Pumping station modernisation – efficiency and longevity

A large pumping station in the city centre has just undergone extensive modernisation. The existing pumps were worn out and a reliable and energy-efficient solution was needed.

Overpumping with nine portals on Peder Lykkes Vej

When lining sewer pipes, it’s important to ensure an efficient and reliable solution to divert water.

Bypass pumping of the Alling å

In December 2023, Alling å was blocked after a major landslide. RH Pumper was called in to perform an emergency bypass pumping of the river, which has now been rerouted to avoid pollution.
Search
  • Danish
  • English
  • Swedish
Search
  • Danish
  • English
  • Swedish