Here’s How a Pump Service Inspection Is Performed

During a service inspection, the submersible pump is removed from the well, cleaned, and inspected item by item—mechanical components, electrical system, controls, and alarms. The pump is test-run, and each inspection is documented in a service report with photos, so its condition can be tracked from one service visit to the next.
Home » News & Events » Here’s How a Pump Service Inspection Is Performed

What You Can’t See From the Edge of the Well

A submersible pump operates submerged, that is, underwater. You can hear it running, and you can see the water level dropping. You cannot see the pump’s condition or how long it will last.

The impeller wears out, the wear ring wears out, and the cable is also often severely damaged by the water in the well. The check valve begins to close improperly, causing the fluid to flow back, and the pump starts more often than it should. None of these issues become apparent until the capacity has dropped so much that someone notices it—and by that point, the pump has usually been running too hard for a long time.

A visual inspection from the edge of the well shows whether the pump is running. A service inspection provides information about the pump’s condition and any wear parts that need to be replaced.

Below is a walkthrough of a full service inspection of a submersible pump in a well or pumping station, as it is performed in practice—step by step, in the order that makes the most sense.

Here's How the Inspection Is Conducted

What does the service report say?

The report is not a receipt. It is the only place where the pump’s condition is documented in writing, and it is therefore what the next technician, your building owner, and your insurance company will read.

Each checkpoint is assigned one of four statuses:

  • Checked and in order – the item has been reviewed with no comments
  • Not applicable —the item does not exist or cannot be checked on the model in question, e.g., a sealed oil chamber
  • Replaced – the part was replaced during the visit
  • Error – something has been detected that requires action

In addition, the report includes the pump’s master data, measured values, photos from the inspection, as well as the date and signature.

The value does not lie in any single report. It lies in the series of reports. A pump whose insulation resistance has steadily decreased over three inspections presents a different problem than a pump whose readings remain stable—and this can only be determined if the reports are comparable.

Does the pump always have to be removed?

During a full service inspection: yes. The impeller, wear rings, pump housing, cable gland, and lifting chain cannot be inspected while the pump is submerged in the fluid.

However, it is possible to arrange for lighter inspections between the full inspections, during which operation, controls, levels, and alarms are checked without hoisting the pump out of the water. This is a less expensive and faster inspection, and for some systems, this combination makes sense: ongoing inspections throughout the year and one thorough annual inspection during which the pump is removed.

But the two should not be confused. An inspection identifies operational faults. A maintenance check identifies wear and tear. If an inspection is chosen simply because it is the easiest option, the wear and tear will not be detected until capacity is lost.

The scope and frequency should be determined based on:

  • Pump Type and Installation
  • The fluid the pump handles
  • Operating Hours and Load
  • The Consequences of a System Outage
  • Past Problems and Repairs
  • Your own documentation requirements

What makes dry-mounted pumps different?

The discussion above focuses on submersible pumps in wells or pumping stations, as this is the most common configuration in wastewater and drainage systems.

If the pump is a dry-mounted wastewater pump, a centrifugal pump on a foundation, or a process pump, the items regarding the guide tube, base plate, and lifting chain do not apply. Instead, other items are added: alignment between the motor and the pump, the condition of the coupling, bearings and bearing temperature, shaft seal or stuffing box, vibration level, and the condition of the suction line and any foot valve.

The logic is the same: functional testing first, mechanical inspection, then electrical and control systems, and documentation last.

How often should inspections be performed?

The interval is determined based on the medium, operating hours, and how critical the pump is—not based on a standard template. An annual service inspection is a common starting point, but it is just a starting point, not a definitive answer.

Clean water and light wastewater, moderate operation

In this case, an annual inspection is typically sufficient. The important thing is that it is actually carried out and that the report can be compared with last year’s.

Wastewater high in fat or high in fiber

Deposits and clogging determine the service interval. In this case, the inspection is just as much about removing buildup as it is about measuring the wear on the pump.

Slurry, sand, and abrasive media

Wear on the impeller and wear rings occurs significantly faster. It is typically in this area that more frequent maintenance pays for itself directly in terms of energy consumption and capacity.

Continuous operation or critical function

Operating hours provide a better basis than the calendar. In the case of critical operations, the interval should also be considered in light of whether a backup pump is available or whether access to a loaner pump is possible.

Facility with surveillance

If the pump is connected to level sensors, alarms, and SRO, maintenance can shift from being schedule-based to condition-based. Inspections don’t disappear—but they can be scheduled based on what the data shows, rather than on when the last inspection was performed.

Checklist: What Is Reviewed, and What Does It Reveal?

 

Item What Is Checked What it can reveal
Registration Number of pumps, make, model, serial number, kW, RPM, voltage, Hz Basis for comparison and correct spare parts
Forced Operation Run the pump before stirring Operational errors that occur only in the normal configuration
Cleaning Heavy deposits are removed What the medium actually contains and where it accumulates
Pump Housing and Clog Cracks, corrosion, and wear on sealing surfaces Early signs of leaks and material degradation
Impeller Edges, erosion, imbalance, impact marks Causes of declining capacity
Wear Rings Gap between the impeller and the wear ring Recirculation, increased energy consumption
Oil Level and Appearance Water past the shaft seal (milky-white oil)
Guide tube Wear, misalignment The pump does not seat or seal properly
Check Valve Tightness and Function Backflow and too many pump starts
Gate Valve Operability Can the system be shut down in case of an accident or for repairs?
Lifting Chain Chain and Shackles Safety When Lifting Over an Open Well
Cables and Components Overheating, damage, penetration Early signs of electrical faults before a shutdown
Insulation Test Insulation Resistance of an Electric Motor Moisture ingress in the motor
Connections Loose connections, electrical and mechanical Thermal relays, vibration damage
Level Sensors Monitoring and Adjustment Incorrect start/stop, unnecessary starts
High Water Alarm Activated and signal path tested Alarm that has been out of service
Well and station Foreign objects, visible damage Operational risk and safety for the next visit
Documentation Status per item, photo, date, signature Traceable history and documented maintenance

Warning signs between two inspections

There are some signs that warrant immediate attention, without waiting for the next scheduled visit. Capacity is decreasing, even though the flow rate hasn’t changed. Energy consumption is rising. The pump starts more often than usual or runs longer per start. New noises are appearing—knocking, whining, or a different sound than usual. The motor protection switch trips occasionally and can be reset. There’s water where there isn’t usually any. And one of the most overlooked signs: the alarm hasn’t sounded in a very long time.

Most of them are inexpensive to address but costly to ignore.

Frequently asked questions

What does a pump service inspection include?

The pump is removed from the well, cleaned, and inspected mechanically: pump housing, strainer, impeller, wear rings, and oil. Next, the well’s mechanical components—guide tube, check valve, gate valve, and lifting chain—are inspected, along with the electrical system, including cable inspection, an insulation test of the motor, and a check of all connections. Finally, the level sensors/pressure transmitters and high-water alarm are tested, and the entire inspection is documented in a service report with photos.

Does the pump need to be removed from the well?

During a full service inspection, yes. There are less extensive inspections that do not involve disassembly, during which operation, controls, fluid levels, and alarms are checked, but these detect operational faults—not wear and tear.

How long does a service check take?

It depends on the number of pumps in the well, the access conditions, and what is encountered along the way. Inspecting a single pump at an easily accessible station takes significantly less time than inspecting a station with multiple pumps and limited access.

Why is the insulation resistance of the motor measured?

This is one of the earliest measurable signs of moisture in the motor. The insulation resistance drops long before the pump begins to shut off, and by recording the measurement at each inspection, the trend can be tracked over time. A pump whose insulation resistance has steadily decreased over three inspections presents a different problem than a pump whose readings remain stable.

Why is the flood alarm tested every time?

Because an alarm that has never sounded is just like an alarm that works. Testing means activating the alarm and verifying that the signal reaches the person who is supposed to respond to it—not just that the sensor is triggered.

Can the scope of the inspection be tailored to our facility?

Yes. The points above provide an overview of a typical submersible pump installation, but the scope and frequency are agreed upon on a case-by-case basis. If you have specific requirements—such as certain fluids, documentation requirements from the building owner, critical pumps that need to be inspected more frequently than others, or pump types that require different inspections—the inspection will be organized accordingly.

What happens if a defect is found during the inspection?

The fault is noted in the report along with its status, and a decision is made as to whether it can be repaired on-site, whether a replacement part needs to be ordered, or whether the pump needs to be taken to the repair shop. This is precisely why recording the model and serial number at the start of the inspection is not a waste of time.

What do the statuses in the service report mean?

Each item is assigned one of four statuses: checked and in order, not relevant (the item does not exist or cannot be checked on the model), replaced, or defective. “Not applicable” is not the same as “skipped”—it means that the item has been evaluated and excluded for a specific reason.

What do we use the service report for?

To provide the next technician with a starting point rather than a guess, to document maintenance work performed for the building owner, insurance companies, and authorities, and to be able to track trends. Standalone reports have limited value. Reports that can be compared year over year show which pumps are heading in an undesirable direction.

A service inspection of a submersible pump consists of a functional test in its normal operating configuration, removal and cleaning, a mechanical inspection of the pump housing, impeller, impeller, wear rings, and oil, an inspection of the well’s mechanical components—including the guide tube, valves, and lifting chain—an electrical inspection with cable checks, insulation testing, and connection verification, as well as testing of level sensors and the high-water alarm. The process concludes with a service report detailing the status for each item, including photos, signatures, and a reminder for the next inspection. The frequency and scope of the service are determined based on the fluid type, operating hours, and the criticality of the pump—not based on a standard template.

RH

About This Guide

This guide was written by RH Pumpers’ pump technicians, who service pumps and pumping stations on a daily basis for contractors, utility companies, and industrial customers throughout Scandinavia. We service all brands and have our own workshop, a mobile workshop, and a spare parts inventory.

We always dispatch two technicians for service calls. This is a standard procedure, not a decision made on a case-by-case basis, and it is based on safety considerations when working in wells and pumping stations. We are certified to ISO 45001 (occupational health and safety), ISO 14001 (environmental management), and DS 21001 (railway safety for contractors), which allows us to perform service and maintenance for clients in the utility sector, including Banedanmark, Ørsted, Novo, and others. The certifications can be viewed at rhpumper.dk/certificeringer.

The scope of a service inspection can be tailored to your system and your documentation requirements. If you’d like us to take a look at your pumps, feel free to contact us for a no-obligation consultation: +45 58 50 60 65 or info@rhpumper.dk.

In the article

Share this article

Contact us

We are ready to help.

Do you have any questions about pumps, overpumping or service? Write or call us and we will help you quickly.

Call us

Send an email

Cases

Flushing

Flushing of process pipes: High reliability from day one

When clean pipes are not just a requirement, but critical success criteria, proper flushing becomes a key part of any commissioning. RH Pumper delivered high performance, rapid mobilization and specialist technical knowledge for an extensive project on Zealand – with pipe dimensions up to 700 mm.

Low-noise bypass pumping in cottage area in Mellbystrand

In cottage areas, consideration for the surroundings is crucial.
Portal overpumpming

Reliable and climate-friendly bypass pumping in the heart of Uppsala

RH Pumper has delivered an elegant and quiet pumping solution for an infrastructure project in the Swedish city of Uppsala, 100 kilometers north of Stockholm. The project combines high technical quality with consideration for both the environment and urban life.