RH Pumper has just completed an extensive overpumping job on Peder Lykkes Vej, where nine portals were set up to maintain the flow during the work.
From Grønjordsvej to Englandsvej
The overpumping starts at Grønjordsvej, where the first portal of 48 metres and a clearance height of 5.20 metres is located across Amagerfælledvej. From here, the overpumping extends all the way to Englandsvej, where special consideration for traffic was necessary. Englandsvej is a narrow and busy road, and therefore, the portal leg was placed across the top pipe. This solution minimised the width of the road block so that traffic could flow with the least possible inconvenience.
Traffic-friendly solutions along Peder Lykkes Vej
The overpumping was located between the cycle path and roadway along Peder Lykkes Vej. The many portals were set up so that traffic from the school road and cycle paths could easily get onto the road and avoid diversions. The slightly curved road required a special solution where one of the portals was angled 22 degrees. This detail ensured that the water could be channelled without problems, even on a curved stretch.
Environmentally friendly and quiet pumps
To ensure minimal inconvenience to both residents and the environment, three PX4 200mm 30KW electric pump units were used. These pumps are particularly environmentally friendly and quiet, making them ideal for densely built-up areas like this. The choice of electric pumps also contributes to a greener and more climate-friendly solution without compromising on performance.
All pumps are monitored 24/7 using SCM (Supervision, Control and Monitoring).
Taps are installed between all the portals, which makes it possible to empty the pipes of waste water when the portals are dismantled.
RH Pumper is proud to provide reliable, quiet and traffic-friendly solutions like this one, balancing efficiency, environmental considerations and climate-friendly methods.